Unofficial translation — the official text is the one published in the Official Bulletin of the Kingdom of Morocco: Law No. 25-90, Official Bulletin No. 4159 of 15 July 1992, p. 307, as amended and supplemented by Law No. 66-12. CITURBAREA translated it from the French consolidated version of 18 April 2019; it has no legal force, and in case of any discrepancy the text published in the Official Bulletin prevails.
Dahir No. 1-92-7 of 15 Hijja 1412 (17 June 1992) promulgating Law No. 25-90 on subdivisions, housing groups and parcelling, as amended and supplemented by Law No. 66-12 (Dahir No. 1-16-124 of 21 Kaada 1437 (25 August 2016)); consolidated version as of 18 April 2019. The law was adopted by the Chamber of Representatives on 19 Jumada II 1412 (26 December 1991) and published in Official Bulletin No. 4159.
LAW No. 25-90 ON SUBDIVISIONS, HOUSING GROUPS AND PARCELLING
TITLE I: SUBDIVISIONS
Article 1 (unofficial translation)
Any division, by sale, lease or partition, of a landed property into two or more lots intended for the construction of buildings for residential, industrial, tourist, commercial or craft use, whatever the area of the lots, constitutes a subdivision (lotissement).
Article 2 (unofficial translation)
The creation of a subdivision is subject to obtaining a prior administrative authorisation issued under the conditions laid down in this title.
Chapter I: Authorisation to subdivide
Article 3 (unofficial translation)
The authorisation to subdivide referred to in Article 2 above is issued by the president of the municipal council. Where the property concerned is located in two or more municipalities, the authorisation is granted by the Minister of the Interior or, by delegation, by the wali or the governor concerned, after the opinion of the presidents of the municipal councils concerned.
The president of the municipal council sends a copy of the authorisation to subdivide to the local administrative authority concerned immediately after it has been issued to the applicant.
Article 4 (unofficial translation)
The authorisation referred to in Article 2 above is issued upon application by the applicant, accompanied by:
1. A topographic plan drawn up on the basis of the calculated points of the perimeter to be subdivided shown on the land registry plan;
2. The documents relating to the urban design of the subdivision (layout of the subdivision and its integration into the sector);
3. The technical documents relating to the construction of roads and utility networks (water, sewerage, electricity);
4. The specifications (cahier des charges) stating in particular the easements of any kind encumbering the property, the volume and siting conditions of the buildings, as well as the infrastructure to be built by the municipality and that to be built by the developer.
Article 5 (unofficial translation)
The application referred to in Article 4 above is inadmissible if the land is not registered or in the process of registration. In the latter case, for the application to be accepted, the time limit set for filing objections must have expired and no objection must have been lodged.
This application is also inadmissible if the accompanying file does not include all the documents listed in Article 4 above.
Article 6 (unofficial translation)
The authorisation to subdivide is issued when the proposed subdivision is found to comply with the laws and regulations in force, in particular with the provisions of the zoning plans and development plans.
The said authorisation is issued subject to the authorisations provided for by specific legislation and after obtaining the opinions and approvals provided for by the regulations in force.
Article 7 (unofficial translation)
Any refusal of the authorisation to subdivide must state the reasons.
The authorisation to subdivide is refused in particular if the subdivision is not connected to the road, sewerage, drinking water supply and electricity networks, subject to the provisions of Article 21 below.
Article 8 (unofficial translation)
Where the use of the land is defined by a zoning plan or a development plan, the silence of the administration amounts to an authorisation to subdivide on the expiry of a period of three months from the filing of the application. A subdivision carried out under these conditions must comply with the regulations in force, in particular with the provisions of the zoning plans and development plans.
Any request for modification made by the administration interrupts the running of the above time limit.
Article 9 (unofficial translation)
Where the use of the land is not defined by a zoning plan or a development plan, the authority competent to issue the authorisation may, after the opinion of the administration:
1. Within the perimeters of urban municipalities, delimited centres and zones with a specific vocation:
- either defer its decision on the applications for authorisation to subdivide;
- or issue the authorisation to subdivide if the proposed subdivision is compatible with the provisions of the urban development master plan and, in the absence of a master plan, if it is compatible with the de facto vocation of the sector concerned.
2. Outside the perimeters referred to in 1° of this article, issue the authorisation to subdivide if the subdivision is reserved for buildings intended for scattered housing, tourist activities or activities linked to agriculture, and on condition that each lot has a minimum area of one hectare.
Article 10 (unofficial translation)
At the request of the developer, the authorisation to subdivide shall specify that, for the execution of the works provided for in Article 18, I of this law, the subdivision is divided into sectors.
Article 11 (unofficial translation)
The authorisation to subdivide, whether express or tacit, lapses if the developer has not carried out the infrastructure works referred to in Article 18 of this law on the expiry of a period of three years running from the date on which the authorisation was issued or from the date of expiry of the three-month period referred to in Article 8 above.
Chapter II: Obligations and rights of the developer
Section 1: Filing of the approved file with the land registry
Article 12 (unofficial translation)
As soon as the authorisation to subdivide is obtained, the developer must file with the land registry (conservation foncière) a copy of the file covered by the said authorisation.
Section 2: Involvement of the architect, specialised engineers and the surveyor
Article 13 (unofficial translation)
The use of an architect practising privately and duly registered with the Order is compulsory for:
- the urban design of the subdivision project;
- the preparation of the documents relating to the architectural design to be submitted to the competent authority in order to obtain the authorisation to subdivide.
Article 14 (unofficial translation)
The use of a surveyor is compulsory for the preparation of the topographic plan on the basis of which the architect will design the subdivision project.
Article 15 (unofficial translation)
The use of specialised engineers is compulsory for the preparation of the technical documents (plans and studies) relating to the construction of roads, sewerage, and water and electricity networks.
Article 16 (unofficial translation)
The documents submitted in support of the application for authorisation to subdivide and listed in 2° and 4° of Article 4 above must be drawn up and signed by the architect. The topographic plan referred to in 1° of the said Article 4 and in Article 14 above must be drawn up and signed by a surveyor approved in accordance with the regulations laying down the conditions for the approval and supervision of private surveyors and of companies carrying out topographic work on behalf of public administrations and certain persons. The documents referred to in 3° of Article 4 above must be drawn up and signed by specialised engineers.
Article 17 (unofficial translation)
The developer must appoint either an architect, a specialised engineer or a surveyor as coordinator responsible for ensuring the proper execution of the works.
Section 2 bis: Organisation of the construction site
Article 17-1 (unofficial translation)
The authorisation to subdivide and the authorisation to create a housing group must provide for the obligation of the beneficiary to do the following:
a) Before the opening of the site:
- file at the seat of the municipality, against a dated and signed acknowledgement of receipt bearing a serial number, a declaration of opening of the site signed by the coordinator appointed under Article 17 above, before the works begin. The municipality sends a copy of the said declaration and a copy of the said acknowledgement of receipt to the local administrative authority;
- install a hoarding around the site and, at its entrance, a sign showing the number of the authorisation, the date on which it was issued, the name of the project owner and the places where the documents relating to the subdivision are kept;
b) During the period of execution of the works:
- keep on site the authorised documents bearing the approvals of the competent services and the words "ne varietur", as well as the technical documents drawn up by a specialised engineer, in accordance with the laws and regulations in force in the fields of urban planning, subdivisions and housing groups;
c) At the end of the works:
- file at the seat of the municipality, against a dated and signed acknowledgement of receipt bearing a serial number, a declaration of closure of the site and completion of the works, by which the above-mentioned coordinator certifies that the works have been completed in accordance with the authorised documents and with the provisions of the authorisations relating to the creation of subdivisions or housing groups. A copy of the said declaration and a copy of the said acknowledgement of receipt must be sent to the local administrative authority and to the urban agency.
Article 17-2 (unofficial translation)
The project coordinator must keep on site, throughout the period of execution of the works, a site logbook whose model is established by the competent administration.
The site logbook includes in particular:
- all the information identifying the project;
- the nature of the works;
- the identification of the contractors according to the nature of their activities;
- the notice of opening of the site;
- the dates, notes, orders, minutes, observations and visits of the various parties concerned, in particular the architect in charge of the project, the specialised engineer and the surveyor-topographer engineer;
- the certificate of the declaration of closure of the site and completion of the works.
Section 3: Infrastructure works
Article 18 (unofficial translation)
Only subdivision projects providing for the following may be authorised:
I. The following infrastructure works:
- the construction of internal access roads and car parks;
- water and electricity supply, and the disposal of waste water and waste matter;
- the landscaping of open spaces such as squares, green spaces and playgrounds;
- the connection of each lot to the various internal networks of the subdivision;
- the connection of the internal roads and utility networks to the corresponding main networks;
- the construction of roads and connections giving free access to the seashore where the subdivision borders the maritime public domain.
II. The reservation of spaces intended for community facilities and installations of general interest corresponding to the needs of the subdivision, such as a shopping centre, mosque, hammam, bakery oven, school, dispensary, and spaces intended for sports activities to be created in accordance with the provisions of Article 62 of Law No. 06-87 on physical education and sport, promulgated by Dahir No. 1-88-172 of 13 Chaoual 1409 (19 May 1989).
Article 19 (unofficial translation)
In urban municipalities and delimited centres, for subdivision projects intended to receive:
- either villas;
- or buildings of any nature or use comprising at least either four levels, or three levels and six dwellings;
- or buildings for industrial or commercial use,
the authorisation to subdivide must be refused if the project does not provide, in addition to the infrastructure works and space reservations referred to in Article 18 above, for the installation of the lines needed to connect the said subdivisions to the general public telecommunications network.
These installations, carried out under the responsibility and supervision of the services competent for telecommunications under conditions laid down by regulation, must meet security requirements, in particular protect the user and the State against any risk of illegal use of the telecommunication lines.
Article 20 (unofficial translation)
A developer who takes the place of the municipality to build the main road and sewerage networks may, on the basis of an agreement concluded with the municipality, collect from the owners of land benefiting from these new networks a compensation calculated as for the initial infrastructure tax (taxe de premier établissement). This compensation shall be recovered by the municipality from the said owners in accordance with the procedures laid down for that tax and paid over to the developer up to the amount of the works he has carried out in place of the municipality.
Article 21 (unofficial translation)
Projects that do not provide for all or part of the works listed in § I of Article 18 above may, however, be authorised after the binding opinion of the administration:
- where, because of the purpose or location of the subdivision, the execution of these works is not justified;
- where these works cannot be carried out for technical reasons such as the absence of the corresponding main network.
Article 22 (unofficial translation)
The developer must declare the completion of the infrastructure works provided for in the subdivision project.
The works thus completed shall be subject to a provisional acceptance and a final acceptance.
Article 23 (unofficial translation)
The provisional acceptance enables the municipal administration to ensure that the development, servicing and sewerage works carried out comply with those provided for in the authorised project.
This acceptance must take place within forty-five days following the declaration of completion of the infrastructure works referred to in Article 22 above.
Article 24 (unofficial translation)
The provisional acceptance of the works is carried out by a commission made up of representatives of the municipality and of the administration, whose number and status are laid down by regulation, together with a representative of the services responsible for water and electricity supply.
The developer, the contractor, the architect, the specialised engineer and the surveyor are invited to the meeting of the commission.
At the end of the meeting, either minutes of provisional acceptance of the works or the report of findings provided for in Article 26 below are drawn up, as the case may be.
The president of the municipal council sends a copy of the minutes of provisional acceptance of the works to the local administrative authority concerned and to the urban agency.
Article 25 (unofficial translation)
For the subdivisions referred to in Article 19 above, the provisional acceptance of the works is subject to verification by the services competent for telecommunications of the existence of the lines whose installation is required under that article. This verification must take place within one month following the declaration of completion of the infrastructure works referred to in Article 22 above. If no verification has taken place by the expiry of that period, the competent services are deemed to have no observations on the matter.
Article 26 (unofficial translation)
If the commission finds a lack of conformity between the works carried out and the approved documents, it draws up a report of findings. If, after notification of this report, the developer does not regularise the existing situation within the time limit set by the report, by modification, demolition or execution of additional works, the local authority shall, of its own motion and at the owner's expense, have the irregularly undertaken works demolished or the necessary works carried out.
Article 27 (unofficial translation)
One year after the date on which the minutes of provisional acceptance of the works referred to in Article 24 above were drawn up, the commission referred to in that article carries out the final acceptance of the infrastructure works. The developer, the contractor, the architect and the specialised engineers are invited to this acceptance.
Article 28 (unofficial translation)
The purpose of the final acceptance is to determine whether the roads and utility networks show any defects. If defects are noted during the final acceptance operations, the developer is requested to take the necessary measures to remedy them.
Article 29 (unofficial translation)
The final acceptance gives rise to the issue by the president of the municipal council of a certificate, drawn up on the binding opinion of the commission referred to in Article 24 above, attesting that the roads and utility networks are in good condition.
The handover to the municipal public domain of the roads of the subdivision or of the housing group, of the water, sewerage and electricity networks and of the planted open spaces remains subject to the issue of the certificate provided for in the paragraph above.
The said handover is recorded in minutes to be entered on the original land title of the subdivision in the name of the municipality. This entry is made free of charge at the initiative of the municipality concerned.
The president of the municipal council sends to the local administrative authority concerned a copy of the certificate provided for in the first paragraph above and of the minutes of handover to the municipal public domain of the roads of the subdivision or of the housing group, of the water, sewerage and electricity networks and of the unbuilt and planted areas.
Section 4: Easements that may be imposed on the developer
Article 30 (unofficial translation)
The authority competent to issue the authorisation to subdivide may make it subject to any modifications of the project that it deems useful. It may in particular:
- impose the creation of easements in the interest of public safety, hygiene, traffic and aesthetics;
- impose the preservation of existing plantings;
- impose the rectification of the boundaries of the subdivision;
- impose additional space reservations for community facilities and installations of general interest whose siting is made necessary by the creation of the subdivision.
Article 31 (unofficial translation)
Easements established pursuant to the preceding article, with the exception of those imposed in the interest of public safety, hygiene, traffic and aesthetics and for the preservation of existing plantings, give rise to a right to compensation.
However, easements for additional space reservation and for roads give rise to a right to compensation only if the reserved area represents:
- More than 25% of the total area, where the average area of the lots is equal to or greater than 1,000 square metres;
- More than 30% of the total area, where the average area of the lots is less than 1,000 square metres and equal to or greater than 600 square metres;
- More than 35% of the total area, where the average area of the lots is less than 600 square metres and equal to or greater than 350 square metres;
- More than 40% of the total area, where the average area of the lots is less than 350 square metres and equal to or greater than 200 square metres;
- More than 45% of the total area, where the average area of the lots is less than 200 square metres and equal to or greater than 100 square metres;
- More than 50% of the total area, where the average area of the lots is less than 100 square metres.
The compensation provided for in this article is due only for the reserved area exceeding that resulting from the application of the rates set above.
The compensation is fixed either by agreement or, failing that, by the court, on the basis of the value of the land on the date of the provisional acceptance referred to in Article 23 above.
Section 5: Boundary marking and entry in the land registers
Article 32 (unofficial translation)
The entry on the land title of the property covered by the subdivision, with the subdivision plan transferred onto the land registry plan, may only be made after the survey resulting from the boundary-marking operations has been drawn up and on production of a certified true copy of the minutes of provisional acceptance and, where applicable, of the co-ownership regulations provided for in Article 45 of this law.
As soon as the subdivision plan has been transferred onto the land registry plan, the developer must apply to the land registry for the creation of a land title for each lot.
Chapter III: Deeds of sale, lease and partition relating to subdivisions
Article 33 (unofficial translation)
Deeds relating to the sale, lease and partition operations referred to in the first article above may only be executed after the provisional acceptance by the municipality of the infrastructure works of the subdivision.
Article 34 (unofficial translation)
Where the infrastructure works of the subdivision have been carried out by sectors pursuant to Article 10 above, the deeds referred to in the preceding article may be executed for operations concerning the sectors whose infrastructure works have been the subject of provisional acceptance.
Article 35 (unofficial translation)
Adouls (adoul), notaries and land registrars, as well as registration officers and the bodies competent to authenticate signatures, must refuse to draw up, receive, register or authenticate the signature of any deed relating to the sale, lease or partition operations referred to in the first article above unless there is produced:
- either a certified true copy of the minutes of provisional acceptance;
- or a certified true copy of the certificate issued by the president of the municipal council certifying that the operation does not fall within the scope of this law.
Article 36 (unofficial translation)
Deeds of sale, lease and partition must refer to the specifications of the subdivision, whose purpose is set out in Article 4 above, and to the co-ownership regulations provided for in Article 45 of this law.
A certified true copy of the minutes of provisional acceptance or of the certificate provided for in Article 35 above must be annexed to these deeds.
Chapter IV: Special provisions applicable to subdivisions whose works are carried out in phases
Article 37 (unofficial translation)
The developer may be authorised to carry out the infrastructure of the subdivision in successive phases under the conditions laid down below.
Article 38 (unofficial translation)
To obtain the authorisation referred to in Article 2 above, the developer must provide in support of his application a file comprising, in addition to the documents listed in Article 4 above:
- a programme for the phasing of the works, with their estimated cost, designating the lots for which authorisation of sale or lease will be requested as soon as each phase of works is completed;
- a declaration with authenticated signature providing all useful information on the arrangements for financing the successive phases of the works and on the guarantees provided to secure that financing, such as a personal guarantee, a bank guarantee and a pledge.
Article 39 (unofficial translation)
The guarantee referred to in the preceding article must cover the foreseeable amount of the estimated cost of the infrastructure works that have not been carried out at the time of the sale of the first lots.
Article 40 (unofficial translation)
Where the developer does not comply with the programme for the phasing of the infrastructure works referred to in Article 38 above, the president of the municipal council serves on him a formal notice to carry out the planned works within a time limit that he sets. If the works have not been carried out within that time limit, the guarantee provided for in Article 38 above is called in favour of the municipality, which shall then, itself or through the person it delegates for that purpose, carry out the necessary works.
Article 41 (unofficial translation)
The provisional acceptance is carried out on completion of each phase of works. The minutes of provisional acceptance are accompanied by a certificate of the president of the municipal council designating the lots whose sale or lease may be concluded. The final acceptance takes place one year after the minutes of provisional acceptance relating to the works of the last phase have been drawn up.
Article 42 (unofficial translation)
Where the guarantee referred to in Article 38 above consists of funds held in an account, that account must be opened with the General Treasury or with a bank. From the completion of the works of the first phase, this account is credited with the price of the lots sold after the provisional acceptance of each phase of works.
The said funds may be released progressively as the works are carried out, after verification of the progress of the said works, on presentation of a certificate issued by the president of the municipal council on the binding opinion of the commission referred to in Article 24 above.
The verification provided for in the preceding paragraph enables the municipal administration to ensure that the progress of the works carried out complies with the forecasts of the programme for the phasing of the works forming part of the file submitted to obtain the authorisation to subdivide or to create a housing group.
The certificate issued by the president of the municipal council specifies the amount of the funds that may be released.
Chapter V: Buildings constructed in subdivisions
Article 43 (unofficial translation)
Buildings to be constructed in subdivisions are subject to the issue of a building permit, even where the said subdivisions are located outside the areas where the said permit is required.
Article 44 (unofficial translation)
Where, in a subdivision, the buildings are to be constructed by the developer himself, the building authorisation may be issued before the completion of the infrastructure works.
Chapter VI: Co-ownership regulations
Article 45 (unofficial translation)
For subdivisions whose common parts, such as roads, green spaces and playgrounds, remain private property, co-ownership regulations must be drawn up by the developer. The purpose of these regulations is to define in particular:
- the parts of the subdivision held jointly by the co-owners;
- the obligations of the co-owners;
- the conditions for appointing the representative of the co-owners.
These regulations must be filed at the seat of the municipality before the provisional acceptance of the infrastructure works of the subdivision.
Chapter VII: Publicity
Article 46 (unofficial translation)
As soon as the authorisation to subdivide is obtained, the following must be made available to the public at the seat of the municipality and of the land registry concerned:
- the documents referred to in the 2nd, 3rd and 4th paragraphs of Article 4 above;
- where applicable, the programme for the phasing of the works provided for in Article 38 above.
The co-ownership regulations referred to in Article 45 above are subject to the publicity provided for in the first paragraph of this article before the provisional acceptance of the infrastructure works of the subdivision.
The documents provided for above must bear the references of the authorisation to subdivide.
They may, at the initiative of the municipality and at the developer's expense, be posted on the site of the subdivision.
Article 47 (unofficial translation)
Posters, advertisements and all other means of publicity must state the places where the documents referred to in Article 46 above have been filed, as well as the references of the authorisation. They must not contain any statement that does not comply with the provisions of the said documents and is likely to mislead purchasers.
Article 48 (unofficial translation)
The date and number of the authorisation to subdivide must be written in legible characters on a sign placed very visibly on the site. The said sign must remain there until the minutes of provisional acceptance have been drawn up.
TITLE II: RESTRUCTURING OF IRREGULAR SUBDIVISIONS
Article 49 (unofficial translation)
Within the meaning of this law, an irregular subdivision means a subdivision carried out without prior authorisation, or a subdivision whose infrastructure works have not been carried out in accordance with the documents on the basis of which the authorisation to subdivide referred to in Article 2 above was obtained.
Article 50 (unofficial translation)
In irregular housing subdivisions to be restructured, the State or the local authorities may expropriate the land needed for the rehabilitation operations pursued in the interest of hygiene, safety and public convenience, in accordance with the provisions of Law No. 7-81 on expropriation for public utility and temporary occupation, promulgated by Dahir No. 1-81-254 of 11 Rejeb 1402 (6 May 1982).
Article 51 (unofficial translation)
In irregular housing subdivisions to be restructured, the developer and the owners of lots contribute to the cost of carrying out the infrastructure that has not been built. This contribution is apportioned and calculated in accordance with the provisions of Articles 52, 53 and 54 below.
Article 52 (unofficial translation)
The financing of the works referred to in the article above is shared equally between the developer and the purchasers of lots.
Article 53 (unofficial translation)
The amount of the contribution owed by each purchaser of a lot for the construction of the water, sewerage and electricity networks is calculated on the basis of the cumulative floor area of the building that the lot can accommodate.
Article 54 (unofficial translation)
The amount of the contribution owed by each purchaser of a lot for the construction of the roads is calculated on the basis of the length of the lot's frontage.
Article 55 (unofficial translation)
Proceedings for the recovery of the contributions referred to in the preceding articles are brought, where necessary, in accordance with the rules laid down for the recovery of debts owed to the State and the local authorities.
TITLE III: HOUSING GROUPS
Article 56 (unofficial translation)
A housing group consists of individual or collective residential buildings erected on a single plot or on several adjoining or neighbouring plots, simultaneously or successively, by the owner or the joint co-owners of the plot or plots concerned.
Article 57 (unofficial translation)
The provisions of Title I of this law apply to housing groups.
TITLE IV: PARCELLING
Article 58 (unofficial translation)
In urban municipalities, delimited centres, their peripheral zones, urban planning groupings, zones with a specific vocation, and any other part of the territory covered by an approved urban planning document such as the urban development master plan and the development plan of a rural settlement, the following are subject to prior authorisation of parcelling (morcellement):
- any sale or partition operation whose purpose or effect is the division of a landed property into two or more lots not intended for construction;
- any sale in joint ownership of a landed property that would have the effect of granting to at least one of the purchasers co-ownership rights whose equivalent in area would be less than the area provided for land lots by the urban planning documents and, where no such area is provided, less than 2,500 square metres.
Article 59 (unofficial translation)
The authorisation referred to in Article 58 above is issued by the president of the municipal council after the opinion of the administration, on the basis of a file whose composition is laid down by regulation. It is deemed granted if the president of the municipal council has not ruled within a period of 2 months from the filing of the application.
Article 60 (unofficial translation)
An application for the authorisation provided for in Article 58 above is inadmissible if the land concerned is located in a building zone under an urban planning document. In that case, the operation may only be authorised under the conditions laid down in Title I of this law.
Article 61 (unofficial translation)
Adouls, notaries and land registrars, as well as registration officers and the bodies competent to authenticate signatures, must refuse to draw up, receive or register any deed relating to the sale or partition operations referred to in Article 58 above that is not accompanied by the authorisation provided for in that article or by a certificate of the president of the municipal council certifying that the operation does not fall within the scope of this law.
Article 62 (unofficial translation)
The deed of sale or partition must mention the authorisation of parcelling or the certificate referred to in the preceding article.
TITLE V: SANCTIONS
Chapter I: Repressive provisions
Section 1: Investigation and recording of offences
Article 63 (unofficial translation)
The following acts constitute offences against the provisions of this law:
- the creation of subdivisions, housing groups or parcelling:
• without prior authorisation;
• without complying with the provisions of the written and graphic documents covered by the authorisations issued for that purpose;
• in a zone not suitable to receive them under the regulations in force;
• on a property belonging to the public or private domain of the State and of the territorial authorities, or on land belonging to ethnic (soulaliyate) communities, without the authorisation required beforehand;
- the use of a building without obtaining a permit to occupy (permis d'habiter) or a certificate of conformity provided for by Law No. 12-90 on urban planning promulgated by Dahir No. 1-92-31 of 15 Hijja 1412 (17 June 1992);
- the performance of acts prohibited under the second paragraph of Article 34 of the said Law No. 12-90 on urban planning;
- any failure to comply with the provisions of the first paragraph of Article 17-2 above relating to the keeping of the site logbook;
- the sale, lease or partition, or the offering for sale or lease, of a lot in a subdivision or of a dwelling in a housing group, where the subdivision or housing group is not authorised or has not been the subject of minutes of provisional acceptance of the works, subject to the provisions of Law No. 44-00 on the sale of buildings under construction (vente en l'état futur d'achèvement).
Article 63-1 (unofficial translation)
The offences mentioned in Article 63 above are recorded, and are the subject of official reports drawn up, by:
- officers of the judicial police;
- urban planning inspectors reporting to the wali, the governor or the administration, having the status of judicial police officer.
The inspectors reporting to the wali, the governor or the administration have the right, in the exercise of their duties, to request the assistance of the police.
The status of judicial police officer is conferred on the above-mentioned inspectors reporting to the wali, the governor or the administration in accordance with the procedures and arrangements laid down by regulation.
The methods and arrangements for the exercise of the duties of the urban planning inspectors reporting to the wali, the governor or the administration referred to in this article, as well as the territorial jurisdiction within which they exercise their duties, are laid down by regulation.
Article 63-2 (unofficial translation)
The inspector exercises his duties of his own motion, or at the request of the local administrative authority, the president of the municipal council or the director of the urban agency, when informed of the offence by the agents responsible for that task who report to these authorities, or at the request of any person who has lodged a complaint.
The inspector who has recorded one of the offences mentioned in Article 63 above draws up an official report in accordance with the provisions of Article 24 of the Code of Criminal Procedure and sends the original to the King's prosecutor within a maximum of three (3) days from the date on which the offence was recorded, together with two certified true copies of the said report, a digital photograph of the site or of the construction or repair works constituting the offence, or any other means of establishing the state of the offence, and all other documents relating to the offence.
A copy of the official report recording the offence is sent to the local administrative authority, the president of the municipal council and the director of the urban agency, as well as to the offender.
Article 63-3 (unofficial translation)
As soon as the offence is recorded, and if the infrastructure or construction works constituting the said offence are still in progress, the inspector or the judicial police officer orders the immediate stopping of the works. He attaches to the said order addressed to the offender a copy of the official report recording the offence and notifies it to the local administrative authority, the president of the municipal council and the director of the urban agency.
If the offender does not comply with the order to stop the works immediately that has been notified to him, the inspector may seize the tools, equipment and construction materials and close the site, affix seals to it and draw up a detailed official report, which he sends to the King's prosecutor.
The inspector may appoint the offender as custodian of the seized items or order them to be moved to a warehouse dedicated for that purpose.
The offender may ask the competent judicial authority to reopen the site and lift the seizure of the tools, equipment and construction materials, either where the offence has been regularised or where the administrative court has issued a decision annulling the measures taken against him.
In the event of conviction, the court orders the confiscation of the seized items, without prejudice to the rights of persons acting in good faith.
Article 63-4 (unofficial translation)
If the acts constituting the offence can be remedied because they do not constitute a serious breach of the provisions relating to subdivisions, housing groups and parcelling, the inspector who recorded the offence orders the offender to take the necessary measures to put an end to the offence within a time limit that may not be less than ten (10) days nor more than one month, and notifies this to the local administrative authority, the president of the municipal council and the director of the urban agency.
If it is found, on the expiry of the time limit mentioned in the first paragraph above, that the offender has not complied with the orders notified to him, the local administrative authority orders the demolition of the works or buildings relating to the creation of the non-compliant subdivision or housing group.
The demolition order is notified to the offender, setting a time limit for carrying out the demolition works. If the demolition works are not carried out within the time limit set, an administrative commission carries them out, at the offender's expense, within a period not exceeding forty-eight (48) hours.
The administrative commission referred to in the paragraph above is composed, in addition to the representatives of the government authorities whose list is laid down by regulation, of:
- the wali of the region or the governor of the prefecture or province, or his representative, as chairman;
- the president of the municipal council or his representative.
All costs arising from the demolition referred to in the third paragraph of this article are recovered by means of a recovery order, in accordance with the provisions of Law No. 15-97 enacting the code for the recovery of public debts.
The methods and arrangements for carrying out the demolition operation are laid down by regulation.
Article 63-5 (unofficial translation)
The demolition of the non-compliant works or building does not prevent the bringing of a public prosecution and does not terminate a prosecution already in progress.
Article 63-6 (unofficial translation)
The provisions of the second, third and fourth paragraphs of Article 63-4 above apply if the offence consists in the creation of a subdivision or a housing group, or in the construction of a building, without prior authorisation.
However, if the works consist in the creation of a subdivision or a housing group on a property belonging to the public or private domain of the State and of the territorial authorities, or on land belonging to ethnic communities, or in a zone which, under the regulations in force, is not suitable to receive the building constructed or under construction, without the authorisation required beforehand, the administrative authority must, of its own motion, demolish the said works at the offender's expense. The demolition does not prevent the bringing of a public prosecution and does not terminate a prosecution already in progress.
Article 64 (unofficial translation)
The representative of the government authority responsible for urban planning is summoned, where appropriate, to attend the hearings of the courts ruling on the offences provided for in Article 63 of this law.
Section 2: Penalties
Article 65 (unofficial translation)
Anyone who carries out the following is punished by a fine of 100,000 to 5,000,000 dirhams:
- the creation of a subdivision or a housing group without prior authorisation;
- a parcelling in breach of the provisions of Article 58 of this law.
Article 66 (unofficial translation)
Anyone who creates a subdivision or a housing group in a zone not suitable to receive them under the regulations in force is punished by one (1) to five (5) years' imprisonment and a fine of 100,000 to 200,000 dirhams.
Article 67 (unofficial translation)
Anyone who has created a subdivision or a housing group, carried out a parcelling or erected a building on a property belonging to the public or private domain of the State and of the territorial authorities, or on land belonging to ethnic communities, without obtaining the authorisations provided for by the laws and regulations in force, is punished by a fine of 100,000 to 200,000 dirhams.
Article 68 (unofficial translation)
Anyone who sells, leases or partitions, or offers for sale or lease, lots of a subdivision or dwellings of a housing group, or acts as an intermediary therein, where the subdivision or housing group was created without authorisation or has not been the subject of a provisional acceptance of the works, is punished by one (1) to five (5) years' imprisonment and a fine of 100,000 to 200,000 dirhams, subject to the provisions of Law No. 44-00 on the sale of buildings under construction.
Article 69 (unofficial translation)
Each sale or lease of a lot in a subdivision or of a dwelling in a housing group created without authorisation or not having been the subject of a provisional acceptance of the works constitutes a separate offence.
Article 70 (unofficial translation)
Any failure to comply with the provisions of the first paragraph of Article 17-2 above relating to the keeping of the site logbook is punished by a fine of 5,000 to 10,000 dirhams.
Article 71 (unofficial translation)
In the event of a repeat offence within one year following the date from which the judgment handed down for the first offence is no longer open to any appeal, the penalties provided for in this chapter are doubled.
Article 71-1 (unofficial translation)
Without prejudice to the penalties provided for above, and in the event of conviction, the court orders, at the offender's expense, the demolition of the buildings and infrastructure built for the creation of the subdivision or housing group constituting the offence, and the restoration of the site to its former state.
Article 71-2 (unofficial translation)
In the case of a non-compliant subdivision or housing group, the court may order, as the case may be and at the offenders' expense, the restructuring of the subdivision or housing group constituting the offence.
Article 71-3 (unofficial translation)
In addition to the cases provided for in Article 129 of the Criminal Code, the following are deemed accomplices to offences against the provisions of this law and against the general or municipal urban planning or building regulations, as the case may be, and are punished by the same penalty as the perpetrator of the offence: the project owner, the contractor who carried out the works, the architect, the specialised engineer and the surveyor-topographer engineer, if they fail to report the offence within forty-eight (48) hours of becoming aware of it; anyone who gave the orders from which the offence originated; and the persons who facilitated or contributed to a non-compliant subdivision or housing group operation.
Chapter II: Nullity of deeds executed in breach of the law
Article 72 (unofficial translation)
Deeds of sale, lease or partition executed in breach of the provisions of this law are absolutely null and void. Actions for nullity may be brought by any interested party or by the administration.
TITLE VI: MISCELLANEOUS PROVISIONS
Article 73 (unofficial translation)
References to this law automatically replace the references to the Dahir of 20 Moharrem 1373 (30 September 1953) on subdivisions and parcelling contained in laws and regulations.
Article 74 (unofficial translation)
The powers conferred by this law on the presidents of municipal councils are exercised in the urban municipalities of Rabat-Hassan and of the Méchouar of Casablanca by the authorities designated respectively in Articles 67 and 67 bis of the Dahir having force of law No. 1-76-583 of 5 Chaoual 1396 (30 September 1976) on municipal organisation, as amended and supplemented in particular by the Dahir having force of law No. 1-84-165 of 6 Moharrem 1405 (2 October 1984).
Article 75 (unofficial translation)
The Dahir having force of law No. 1-84-188 of 13 Moharrem 1405 (9 October 1984) on the Urban Agency of Casablanca remains applicable in all its provisions.
Article 76 (unofficial translation)
The provisions of this law do not apply to subdivisions, housing groups and operations referred to in Article 4 of the Dahir of 20 Moharrem 1373 (30 September 1953) on subdivisions and parcelling for which, on the date of its publication in the Official Bulletin, a duly completed file had been filed at the seat of the municipal authority in order to obtain the necessary authorisation.
Article 77 (unofficial translation)
Subdivisions to be carried out in rural settlements having a development plan pursuant to Dahir No. 1-60-063 of 30 Hijja 1379 (25 June 1960) on the development of rural settlements are not subject to the provisions of this law.
Article 78 (unofficial translation)
The Dahir of 20 Moharrem 1373 (30 September 1953) on subdivisions and parcelling is repealed.